Renewal of swimming pool – Hamburger Stadtpark

The Free and Hanseatic City of Hamburg renewed the 3000 m² "paddling pool" in the play area in the Hamburger Stadtpark. The pool is made of reinforced concrete, and adaptation of the hydraulic system and the water pipework was necessary. Calculation of the hydraulic system was carried out based on the existing pool circulation volumes.

The pool circulating system was redesigned in order to distribute the treated water throughout the pool. An optimum throughflow of the pool was achieved using variations in the location of the inflow openings and the arrangement of horizontal and vertical inflow openings.

The horizontal inflow openings were formed as a special construction due to the shallow pool depth.

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.