Contracting entity

Public contractor

Flood protection at Dradenauer Hauptdeich

The flood protection system in the south of Hamburg was toughened up along a length of around 4 km during reconstruction of the so-called "Finkenwerder junction". During these works earth dykes, floodwater protection walls with extensive pipework breakthrough works, road and rail crossings were constructed.

After completion, the facilities were surveyed and refurbished in accordance with technical services requirements, and technical as-built documentation was provided for operation of the facilities.

Engineering services included professional drawing up of as-built plans and as-built documentation, especially digital refurbishment of the extensive data material.

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.